skip to Main Content

Front Entry Project

Front Entry
Front Entry - During
Front Entry - Complete
Front Entry - Complete

Check Out Some of Our Carpentry Projects Below!

Composite Slate
Copper Drop Ceiling
Removal of 1950 addition - New hip roof framed(addition already removed)
PT deck during
Deck completed
Composite Trim Before
Composite Trim After
House rot
After rot was repaired
Sill rot repaired
Porch removed
Azek composite deck and railings.
Composite columns and railings to bottom floor and replace fir railings to match on top floor.
Completed before paint
New bulkhead with concrete pad before siding was completed above
Interior stairs
Composite porch with fir details
Major rot
After rot repaired and EPDM rubber roof below.
Preparing for Deck
Deck - During
Deck - Complete
Added Railings
Concrete Front Entry - Before
New Front Entry - After
Deck - Before
New Deck - After
New Deck - After
Fir Deck - During
Fir Deck - Complete
Composite Deck - During
Composite Deck - After

Below is a Roofing and Carpentry Job Start to Finish

Check Out Some Videos of the Project Below

Back To Top